Said project shall
include furnishing and installing 8”, 6”, 2” and 1” water lines, gate valves, fire hydrants, roadway bores for
8” and 6” water lines and 18” steel casing, connection to existing water lines and meters, removal of
existing water lines, temporary water lines, installing 6” sewer lines, manholes, cleanouts, sewer service
lines, removing and disposing of existing sewer lines, cured-in-place sewer liners, manhole rehabilitation,
asphalt pavement repair, and various types of concrete and driveway repair.
|