Building Permits

To apply for Building and Trade Permits please use the link to our Permit Portal to apply. All required information can be gathered as you apply. Applications MUST be submitted before they can be processed. Please allow 24 hours for permits to be processed. For Contractor Registration, you may register as you apply or download and fill out the Contractor Registration Form provided. For any questions you may contact our office by email: inspections@mineralwellstx.gov 

We do not validate Building Permits; trades will need to apply for their own permit when working with a General Contractor. When applying please have a copy of the parent permit for information that will be needed. All projects need to have a Registered Contractor.

ASBESTOS SURVEY

Senate Bill 509 requires municipalities to verify that an asbestos survey has been conducted prior to issuing renovation or demolition permits for public or commercial buildings. A copy of the asbestos survey for the area(s) to be renovated/demolished needs to be included with this permit application. This survey will be done in accordance with the Texas Asbestos Health Protection Rules (TAHPR) and the National Emission Standards for Hazardous Air Pollutants (NESHAP).

Please visit the following link to find out if your project requires an Asbestos Survey: https://www.dshs.texas.gov/asbestos-program

PLAN REVIEW

All New Construction, Remodel and Solar Permits will need to go through Plan Review. Please be aware that Plan Review takes 10-14 business days.

INSPECTION REQUESTS

The Inspection Company you choose will be the company that completes your Plan Review and Inspections once your permit has been issued.

For the first inspection of EVERY project please call (940)328-7715 or email inspections@mineralwellstx.gov with your requests.

All inspections are next business day when submitted before 4pm. You will need to either reference your project number or address when placing a request. Please state the Point of Contact's name and phone # within your request. Our inspectors start at 8am, please be sure your project will be ready for inspection by that time, or it WILL be turned down! Inspections will not be scheduled on Holidays that our office is closed.

Inspection results will be emailed to the email address stated on the application and uploaded to your submission.

METER RELEASES

Electric Meter Releases will normally be posted on the same day as the inspection. You have 30 days to contact your provider to get your meter placed before the inspection expires and it will need to be posted again.

• Oncor: 1-800-266-2489

Gas Meter Releases will normally be posted on the same day as the inspection. You have 30 days to contact your provider to get your meter placed before the inspection expires and it will need to be posted again.

• Texas Gas Services: 866-206-9587

Meter Release inspections ARE NOT ADVISED to be scheduled on Fridays, if you insist it will be at your own risk for failure. A re-inspection WILL NOT occur until the next business day. Please plan accordingly.

Water Meter Releases are completed when your initial Plumbing Inspection has occurred for your New Placement of a Water & Sewer Tap. Once the initial inspection has occurred, the release will be sent to the water department for them to be notified to accept application for placement of a New Meter. 

POOL/SPA PERMIT SUBMITTAL REQUIREMENTS

Please review the City of Mineral Wells Land Use Table for city requirements. https://library.municode.com/tx/mineral_wells/codes/code_of_ordinances?nodeId=PTIICOOR_APXBZOOR_ART3PEUS_S3-1USLABU

* Site Plan showing pool placement in relation to property lines, septic systems and spray heads (if applicable), pool equipment and all other structures on the property.
* Pool Plan showing the deck drainage, pool drainage, overflow drainage and sanitary sewer connection (if applicable).

Adopted Residential Pool/Spa Code

Residential 2012 IRC Chapter 42 Appendix G 101
https://codes.iccsafe.org/content/IRC2012/appendix-g-swimming-pools-spas-and-hot-tubs

Adopted Commercial Pool/Spa Code

Texas Administrative Code for Commercial Pools Chapter 265 Subchapter L Rule 265.181
https://texreg.sos.state.tx.us/public/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=25&pt=1&ch=265&rl=181

SOLAR PERMIT SUBMITTAL REQUIREMENTS

• A letter of approval from the Power provider
• A letter from a structural engineer stating the existing roof will support the increased load.
• Stamped, Engineered electrical plans
• Solar Panel location plan
• Solar Panel attachment detail

SIGN PERMIT SUBMITTAL REQUIREMENTS

Please review the City of Mineral Wells Code of Ordinances for Sign Regulations, Chapter 6, Article II.
https://library.municode.com/tx/mineral_wells/codes/code_of_ordinances?nodeId=PTIICOOR_CH6ADSI_ARTIISIRE

WATER & SEWER TAPS

You may need a Water & Sewer Tap for your New Build. You will need to contact Public Works (940)328-7777 to get this processed.